New bridge girder method which increased eccentric effectiveness of central PS tendon and completely integrated connection point with steel plate + PS tendon + re-bar

 
 

Perfect continuous structure by using structural junction with S.R.C. section and PS tendon

Using only one bearing at the connection point


 

Increased cross section stiffness by optimizing eccentric effectiveness due to embedded steel plate on the top flange

Perfect maintenance because of  multi purpose anchorage block