|
|
|
| |
|
New bridge girder method which increased eccentric effectiveness of central PS tendon and completely integrated connection point with steel plate + PS tendon + re-bar
|
 |
| |
 |
| |

|
Perfect continuous structure by using structural junction with S.R.C. section and PS tendon
|
|

|
Using only one bearing at the connection point
|
|

|
Increased cross section stiffness by optimizing eccentric effectiveness due to embedded steel plate on the top flange
|
|

|
Perfect maintenance because of multi purpose anchorage block
|